logo_web1.jpg (5049 bytes)
HOME Current Version  ET GeoWizards 9.9  released 31 May 2009 HOME

ET GeoWizards - Performance tests

Function

Number of Features

ET GeoWizards 9.8
(time in minutes)

ET GeoWizards 9.9
(time in minutes)

Improvement

Result/Note

Clean Polygons 68,000 13 12 8% 70,000 Polygons
5,500 Overlaps cleaned
Build Polygons 285,000 Polylines 50 17 195% 68,000 Polygons
Clean Polylines 560,000 Polylines 34 28.5 19% 905,000 Polylines
370,000 new nodes
Renode Polylines 285,000 Polylines  6.5 3 115% 205,000 Nodes
           
Build TIN + Analyze TIN 150,000  Points  9.5 5 90%  
400,000  Points  35 20 75%
Build Thiessen Polygons 150,000  Points  21 10 110% No attach attributes option used
Polyline To Point (vertices option) 11,000 Polylines  11.5 11.5 0% 1.2 Million Points
Polyline To Point (vertices option) 285,000 Polylines  9 8 12.5% 900,000 Points
Point To Polyline 1.2 million Points  8 2 300% 11,000 Polylines
Point To Polyline 900,000 Points  7 2.5 180% 285,000 Polylines
Move Shapes 285,000 Polylines 3 2 50%  
Merge Layers 2 layers 285,000 features each 7.5 5.5 35%  
Notes:
  • The performance depends very much on the data to be processed. For the topology functions the  quality of the input data is a major factor - the more unresolved intersections (polylines) or overlaps (polygons), the slower the process.
  • The number of vertices in the input dataset has also major influence on the performance. See the test results for the Polyline To Point and Point To Polyline functions above.
  • The tests above are performed on the same PC and the same data with both versions of ET GeoWizards
  • All the tests are performed on Intel(R) Core(TM)2 Duo 2.66Ghz, 2 GB of RAM

For any comments and enquiries contact: webmaster@ian-ko.com
All ESRI products mentioned are trademarks of Environmental Systems Research Institute, Inc.
Copyright: Ianko Tchoukanski